Projects

OGS FZE HAS SO FAR SUCCESSFULLY COMPLETED

 Subsurface Studies

• 16 Oil and Gas-Condensate Fields in Azerbaijan (Mishovdag, Kelameddin, Buzovna-Mashtaga, Gala, Zire, Kirhovdag, Neftcala, Neftdaslari, Balakhani, Bibiheybat, Karacukur, Siyazen, Bahar, GumDenizi, Bahar-2 exploration, Umid-Babek)

• 2 Heavy Oil Carbonate Fields in Turkey (Shellmo, Perenco fields in Diyarbakir)

• 3 Oil (Arpatepe, Kozluk, Alaşehir) / 9 Gas Fields (Göçerler, Adatepe, Çayırdere, Alpullu, Pasaköy, Eskitaslı,Reisdere, Velimeşe, Dikilitaş ) in Turkey

• 1 Underground Gas Storage Simulation Project in Turkey

• 1 Ground Water Pollution Modelling Project in south eastern Turkey

• 1 Depleted Oil Field for Converting to CO2 Sequestration Project in Spain

• 1 Reservoir Characterization Study of Bitumen Carbonate Reservoir in Canada

• 2 Thermal Recovery Simulation Projects (SAGD) in Canada

• 2 CO2 Sequestration Simulation Projects in Europe (EC-project)

• 1 Oil Field in Turkmenistan (Burun)

• 4 Oil/Gas Fields in Russia (Yuzhno-Kytmsky, Novy Urengoi, Odeskoe, Bezimenskoe)

• 6 Oil Fields in Kazakhstan (Karakuduk, Karacambaz, Kozhan, Morskoe, Karatal and Dauletaly)

• 3 Gas Fields in Ukraine (Shkrupie, Mex-Gol, SV)

• 7 Oil Fields in Iraq (Chia-Surkh, Rumalia, AinZalah, Butmah, Cemcamal, Anfal, Pulkano)

• 2 Oil Fields in Yemen Republic (Block-53, 73)

• Exploration blocks in Niger 

• 2 Exploration blocks in Sudan (Block10, 12)

• 3 Geothermal Development – Power Plant Projects in Turkey

Short courses in Production & Reservoir Engineering Topics in Turkey, Kazakhstan, Azerbaijan, Qatar, Canada

  

Turnkey Drilling

Drilled 25 Wells successfully with the average depth of 3500m in Rumaila field for BP Company. Last 3 wells were drilled in 18, 17 and 16 days which were Rumaila Field drilling records (Other major drilling companies had average of 50 drilling days for the same well configuration). 

  

Project Management 

  • Surface Facility
    • Prepared basis of design for production facility
    • Managing FEED and Detailed Engineering studies for the production facility
    • Supervised installation and commissioning of production facility
    • Made Hazid/Hazop meetings
  • Production
    • Prepared well testing program & well performance analysis for the existing wells
    • Prepared production surveillance program 

Created production team to run field operations